Customer | Hitachi Power Systems USA | |
---|---|---|
Location | Sioux, Power station, West Elton, MO / Duck Creek, Power station, Canton, IL / Coffeen, Power station, Coffeen, IL | |
Project executed on | 2008 | |
Technical specification | Pressure | 0.06 MPa |
Measurements | 1” up to 32” pipes | |
Medium | Solution of limestone powder | |
Material | GRP with SiCa | |
Temperature | 80 Degr. | |
Market segment | Power |
Plasticon Composites was appointed to supply the spray banks for these three projects. These spray banks have been produced in our production location in Torun (Poland). To make a proper design Plasticon Europe use FEM (Finite Element Method Analyses). Due to the abrasive environment in the absorbers these spray banks have been produced with a 5 mm thick protecting layer based on GRP with SiCa (Silica Carbide) After delivery Plasticon Europe send over a supervisor to each plant and adviced the installation crew during the installation. |
Select your location and language
Europe
North America
South America
Australia